Record

MEK Dewaxing Unit

About this record


Your Field

Petrochemical Civil Construction

Our Expertise

Turnarounds Revamps O&M Support Electrical & Instrumentation Welding & Heat Treatment Refractory & Insulation Scaffolding & Insulation Environmental Cleaning

Call us at:

+5999 868-3347


Email us at:

info@dickanddoof.com



Contact us

Your Field

Petrochemical

Our Expertise

Turnarounds Revamps Startup Support Welding & Heat Treatment Refractory & Insulation Scaffolding & Insulation Environmental Cleaning

Call us at:

+5999 868-3347


Email us at:

info@dickanddoof.com



Contact us
VASELINE, LUBOILS, AND CANDLES
Dewaxing is a separation process that takes advantage of deasphalted oil (DAO) and heavy vacuum gas oil (HVGO) from the vacuum distillation columns as feedstocks in producing lubricating oil base stock and, to some extent, distillate fuels such as gasoline. D&D has experience with the solvent dewaxing process which uses refrigeration, scraping techniques, and methyl ethyl ketone (MEK) and other solvents to produce valuable end-products. As wax crystals are formed through this process, they are filtered and separated from the oil and solvent. The wax goes on to produce candle wax and petroleum jelly (also branded as Vaseline) while the dewaxed oil purifies into the desirable lube oil base stock.

DEEP CLEAN BEFORE A SUCCESSFUL TURNAROUND
Before kicking off a successful MDU shutdown or turnaround, this system requires deep environmental cleaning. With minimising downtime in mind, this requires experience, critical techniques, and specialised tools to ensure no time is lost. D&D approaches this MDUs with specialised cleaning crews with specific targets in mind. Our extensive experience with MDU turnarounds ensured our clients had less downtime and left operators satisfied, ready for a new clean run.

D&D DELIVERED
Safety First. Zero lost-time accidents.
Deep Environmental Cleaning. Specialised crews, techniques, tools and equipment.
On-time. Smart planning and do not miss any opportunity to move the critical path in.

Recent MDU related work completed
Snow 74

Vessels

Snow 24

Columns

Snow 7

Furnace

Snow 4

Reactors

Snow 47

Air Fin Cooler

Snow 125

Exchangers

Snow 7

Compressors

Snow 142

Pumps

Snow 57

Relieve Valves

Snow 141

Levelglasses

Snow 8

Tanks

Snow 55199

Lines & Valves

inch-welds

Snow 74

Vessels

Snow 24

Columns

Snow 7

Furnaces

Snow 4

Reactors

Snow 47

Air Fin Cooler

Snow 125

Exchangers

Snow 7

Compressors

Snow 142

Pumps

Snow 57

Relieve Valves

Snow 141

Levelglasses

Snow 8

Tanks

Snow 55199

Lines & Valves

inch-welds