2013 Other Tanks

Willemstad | Curaçao | Dutch Caribbean

Project Highlights

  • Emergency Revamp Tank 0905 Floating roof
  • Revamp of Tanks 0635 & 0637
  • Revamp of Tank 8887

Project Scope
Dick and Doof managed the capital revamp work as well as the maintenance activities to be accomplished during the Turnaround. Dick and Doof who provided extensive Rigging Engineering to design the critical lift plans which detailed the layout and sequencing of numerous heavy lifts. Despite the fact of substantial scope growth following internal equipment inspections, Dick and Doof completed the project on schedule and on budget with outstanding Safety and Quality.

Scope Summary

  • Plan and Schedule all work
  • Design rigging plans
  • Erection of Regenerator Head and associated components
  • Remove and Install Standpipes
  • Remove and Install main overhead lines
  • Remove and Install expansion joints
  • Remove and Install all associated piping to support FCCU turnaround
  • Torquing and Field Machining
  • Valve Reconditioning
  • Refractory Renewal
  • Blasting and Painting
  • Electrical and Instrumentation Work